by LE | Jul 29, 2011 | Lindemann Engineering
The engine is back in. The cut up header has been put back to stock with a used M-4 Slip-On installed. The rad is now a cross flow for when this engine makes so much power it needs more cooling. The light wheels are on. Next I have to finish the Kit wire harness and...
by LE | Jul 26, 2011 | Lindemann Engineering
Check out Jensen’s Honda. It has rebuilt forks with new springs.
by LE | Jul 18, 2011 | Lindemann Engineering
 I went to the track with one Ninja and came home with 4 Ninja’s. Don’t leave your Ninja’s alone together, they multiply fast.
by LE | Jul 18, 2011 | Lindemann Engineering
I raced Dennis’s Ninja, made a good start, lead for 2 laps and got to within 1.5 sec of the track class record after just 5 rides and took 2nd. Learned more about what the Ninja suspension needs and will use that knowledge to make Dennis’s bike and yours...
by LE | Jul 14, 2011 | Lindemann Engineering
 The trailer is on it’s way back together. The floor is back and has the first coat of paint. The doors are painted. The axles are done. It’s a good thing the bikes are ready for this weekend because the trailer is not, yet.