by LE | Jun 20, 2013 | Lindemann Engineering
 Crash number 36 is the 3rd time ever that I crashed a F-1. On the right side the rear set, bar and tail are damaged. On the left just scuffs on the body work.
by LE | Jun 12, 2013 | Lindemann Engineering
  This set of new ‘11 to ‘13 GSXR 600 body work was used for one show. $700 takes it all including the tank.
by LE | Jun 12, 2013 | Lindemann Engineering
 This is the 250 Ninja that Eric was building for Kenny to race. The body work is being painted with Kenny’s design. I’m putting it together and will be racing it soon in gear that will match the new paint. Eric may race it too. Stay tuned to watch the...
by LE | Jun 10, 2013 | Lindemann Engineering
 The clock on the wall says eleven pm. The 900RR front end is ready. A bunch of other small jobs are done, mostly reducing weight. Check out the nice superbike tail. Less weight. No longer have to remove the tail to take the lowers off. Nice new white paint....
by LE | Jun 4, 2013 | Lindemann Engineering
MG really likes his energy drinks. He left these two Monsters and the little cooler bag in my trailer at Willow this past Sunday. MG, if you ever want to see your drinks again you will bring to me a large ice tea in a cup with ice and a straw at the next MWGP event at...