by LE | Jun 26, 2019 | Lindemann Engineering
I have the new shop set up enough for some work. The CBR has it’s F2 front end again. It and the Ninja are ready for this weekend at Willow with WERA. Then Buttonwillow. Then do the shop lights, walls and floor.
by LE | Jun 13, 2019 | Lindemann Engineering
Big heavy duty shelf’s, floor mats, un-necessary stuff gone. Space limitations = don’t save stuff you don’t use. I’ve started work on the F1 to be ready to race with WERA @ Willow this month.
by LE | Jun 12, 2019 | Lindemann Engineering
Moving into and setting up a new shop is 3D life size Tetris!
by LE | Jun 5, 2019 | Lindemann Engineering
The big stuff is moved in. The small stuff will take longer to arrange and I still have too much stuff to fit in. Because I want the F1 ready to race by the end of this month, the paint, floor and wiring will have to wait.
by LE | May 14, 2019 | Lindemann Engineering
I’m setting up my 8th shop space. This time in a 2.5 car garage. I plan to have LE moved in by the end of May so I can prep a bike for the WERA Willow weekend at the end of June. The new garage door is just one of the steps.
by LE | May 14, 2019 | Lindemann Engineering
I crewed my first car race. Many things are the same but different than motorcycle racing, like how they return damaged race conveniences back to the pits.