(909) 838-4587 ed [at] le-suspension.com
Fischer Up-date

Fischer Up-date

Check out the new Fischer race body work from http://www.catalystracingcomposites.com. I’m also working with http://www.woodcraft-cfm.com on rear sets. The next step after paint from http://www.mcprodesign.com is to build a race exhaust with the help of...
Ready For Work

Ready For Work

  Now when I want to do Lindemann Engineering work I can walk over to my new Suspension Table and get to it.  No more making a mess of my welding table, no more moving things around for one job and back for another.   I learned enought working at Jim’s shop and...
New Work Station

New Work Station

  My new suspension table is about half way done.  It will have a metal top with a lip all the way around to prevent spills.  The vice will go on the angled part.  The back half of the lower table will be a sink that will drain into a bucket.  To the left will be the...

Change of plan.

Sadly the Ninja One Hour had to be canceled because only the “Red Ninja Devils” signed up to race. All the others must have been scared off.So I called Buttonwillow Raceway to see if they knew of someone who wanted my paid for RV spot and they gave me a full refund....

Saturday Report

This weekend I’m working with so many clients it looks like I have a team. Tony is racing a Ninja 250 & a TZ 250. Dennis is racing a Ninja and really dropping his lap times. Dave is racing a GSXR1000, this is his first expert race. Jon is doing fast laps on his...