by LE | Jun 5, 2019 | Lindemann Engineering
The big stuff is moved in. The small stuff will take longer to arrange and I still have too much stuff to fit in. Because I want the F1 ready to race by the end of this month, the paint, floor and wiring will have to wait.
by LE | May 14, 2019 | Lindemann Engineering
I’m setting up my 8th shop space. This time in a 2.5 car garage. I plan to have LE moved in by the end of May so I can prep a bike for the WERA Willow weekend at the end of June. The new garage door is just one of the steps.
by LE | May 14, 2019 | Lindemann Engineering
I crewed my first car race. Many things are the same but different than motorcycle racing, like how they return damaged race conveniences back to the pits.
by LE | Feb 11, 2019 | Lindemann Engineering
I added this brake rod length adjuster so the pedal can be moved to or from the driver. The nice touch is adding a tool size note for the person who wiggles under the car to make the adjustment.
by LE | Dec 23, 2018 | Lindemann Engineering
I’m working on a new Crawford F-3. The turbo brace needed to be in the same place as the water pipe so they passed the pipe through the brace, nice weld too. The car looks super racy and it is but but it’s just a stock street car engine with a strong tran...