by LE | Feb 19, 2011 | Lindemann Engineering
These Ninja’s are just waiting for tomorrow.
by LE | Feb 15, 2011 | Lindemann Engineering
California State Championship Ninja 1 Hour. Two riders. 250 Ninja’s only. Buttonwillow April 23rd. We need 15 teams.
by LE | Feb 15, 2011 | Lindemann Engineering
One of the cool tools that came with buying Lindemann Engineering is this flat table. Made from a large heavy piece of Granite it’s way to heavy for one person to lift. So I set the stand in place and used my Harbor Freight engine hoist AKA Mini Crane and some tie...
by LE | Feb 7, 2011 | Lindemann Engineering
 Albert brought his R-6 in to repair these cracks in his cases. This is the before photo. I forgot to take an after photo. The cracks have been welded and the bolt hole re-drilled and threaded. The oil even stays inside the engine.
by LE | Feb 3, 2011 | Lindemann Engineering
 This trailer is only 16 feet long by 7 feet wide but it contains everything needed to set up the best suspension shop ever. Now it just needs to be unloaded. The tires will be much happier then.