by LE | Sep 4, 2016 | Lindemann Engineering
The bike is together and runs well. Time to ride it around in the pits while working at a not so secret track. Next step is the suspension. I think we will go with LE.
by LE | Sep 2, 2016 | Lindemann Engineering
More progress: New chain & sprockets, Numbers, Instrument Bracket and Both wheels True & balanced.
by LE | Aug 29, 2016 | Lindemann Engineering
After replacing the missing spoke I went to work on our bent and out of round front rim, it’s True now. Then I straightened the brake rotor. Exhaust system installed. New throttle cable installed and throttle tube cleaned, it’s working smooth now. People like to...
by LE | Aug 28, 2016 | Lindemann Engineering
This big Hayabusa is ready to be picked up. My next job is this little TTR125. The springs are a different size and the amount of damping they need is different but the theory behind all suspension is the same.
by LE | Aug 26, 2016 | Lindemann Engineering
The parts are here! First step was to clean the bike. Next step was to do enough work to find out everything that the bike needed. Now we have the parts and still have enough time to order more stuff if I missed something. It’s like I’ve built race bikes...