by LE | Jul 23, 2019 | Lindemann Engineering
The Hurricane ran poorly a few weeks ago at Willow but I found and fixed all the problems in time for WERA at Buttonwillow last weekend. On Friday I made jetting and gearing changes. On Saturday I remembered how to ride and put it all together on Sunday. I was lucky...
by LE | Jun 26, 2019 | Lindemann Engineering
I have the new shop set up enough for some work. The CBR has it’s F2 front end again. It and the Ninja are ready for this weekend at Willow with WERA. Then Buttonwillow. Then do the shop lights, walls and floor.
by LE | Jun 13, 2019 | Lindemann Engineering
Big heavy duty shelf’s, floor mats, un-necessary stuff gone. Space limitations = don’t save stuff you don’t use. I’ve started work on the F1 to be ready to race with WERA @ Willow this month.
by LE | Jun 12, 2019 | Lindemann Engineering
Moving into and setting up a new shop is 3D life size Tetris!
by LE | Jun 5, 2019 | Lindemann Engineering
The big stuff is moved in. The small stuff will take longer to arrange and I still have too much stuff to fit in. Because I want the F1 ready to race by the end of this month, the paint, floor and wiring will have to wait.